Distributed cognition model for project management
DOI:
https://doi.org/10.20397/2177-6652/2023.v23i3.2646Palabras clave:
Project Management, Distributed Team Cognition, Cognitive Style of Leadership, Stakeholder Relationship and Tension, Learning.Resumen
Objective – The purpose of this paper is to present a model of distributed cognition based on project management literature.
Methodology – Utilising the SCOPUS and Web of Science databases, a qualitative and exploratory-descriptive approach was used to conduct a systematic literature review of 138 scientific articles on cognition in projects.
Originality/relevance – This study presents how the field of project management has approached the cognition issues and how cognition can be applied collectively in project teams.
Results – The findings of the synthesis of study results point to four categories (with sixteen subcategories) relate to cognition in project management, and they are as follows: distributed team cognition; cognitive style of leadership; stakeholder relationship and tension; and learning, as well as is presented a cognition model based on the categories and subcategories found.
Contribution – Understand how aspects of cognition can impact the behaviours of the project professional and contribute to problem-solving in the project environment.
Citas
Aggarwal, I., & Woolleyb, A. W. (2019). Team creativity, cognition, and cognitive style diversity. Management Science, 65(4), 1586–1599. https://doi.org/10.1287/mnsc.2017.3001
Ahmad, M. K., Abdulhamid, A. B., Wahab, S. A., & Nazir, M. U. (2022). Impact of the project manager’s transformational leadership, influenced by mediation of self-leadership and moderation of empowerment, on project success. International Journal of Managing Projects in Business, 15(5), 842–864. https://doi.org/10.1108/IJMPB-03-2021-0066
Ahmadi Eftekhari, N., Mani, S., Bakhshi, J., Mani, S., Eftekhari, N. A., Mani, S., Bakhshi, J., & Mani, S. (2022). Project Manager Competencies for Dealing with Socio-Technical Complexity: A Grounded Theory Construction. Systems, 10(5). https://doi.org/10.3390/systems10050161
Ajayi, S. O., Oyedele, L. O., Kadiri, K. O., Akinade, O. O., Bilal, M., Owolabi, H. A., & Alaka, H. A. (2016). Competency-based measures for designing out construction waste: task and contextual attributes. Engineering Construction and Architectural Management, 23(4), 464–490. https://doi.org/10.1108/ECAM-06-2015-0095
Akman, I., Misra, S., & Altindag, T. (2011). The impact of cognitive and socio-demographic factors at meetings during software development process. Tehnicki Vjesnik-Technical Gazette, 18(1), 51–56
Anvuur, A. M., & Kumaraswamy, M. M. (2012). Measurement and Antecedents of Cooperation in Construction. Journal of Construction Engineering and Management, 138(7), 797–810. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000498
Aretoulis, G. N., Papathanasiou, J. B., Zapounidis, K., & Seridou, A. A. (2017). Conscientiousness personality trait defines the competent Greek project manager. International Journal of Business Performance Management, 18(3), 350–380. https://doi.org/10.1504/IJBPM.2017.084857
Asch, S. E., & Witkin, H. A. (1948). Studies in space orientation: I. Perception of the upright with displaced visual fields. Journal of Experimental Psychology, 38(3), 325–337. https://doi.org/10.1037/h0057855
Bai, X.-P., & Qian, C. (2021). Factor validity and reliability performance analysis of human behavior in green architecture construction engineering. Ain Shams Engineering Journal. https://doi.org/10.1016/j.asej.2021.04.009
Barrett, L. (2018). The Evolution of Cognition. The Oxford Handbook of 4E Cognition, 718–734. https://doi.org/10.1093/oxfordhb/9780198735410.013.38
Barrett, P., & Sutrisna, M. (2009). Methodological strategies to gain insights into informality and emergence in construction project case studies. Construction Management and Economics, 27(10), 935–948. https://doi.org/10.1080/01446190903273943
Bhowmick, S., Chandra, A., Harper, J. S., & Sweetin, V. (2015). Collaborative Learning Using a Project across Multiple Business Courses: A Cognitive Load and Knowledge Convergence Approach. Decision Sciences-Journal of Innovative Education, 13(2), 197–219. https://doi.org/10.1111/dsji.12060
Bizarrias, F. S., Da Silva, L. F., Penha, R., & Russo, R. (2020). Relationship Between Marketing and Project Management Success Through Cognitive Process Lens. IEEE Access, 8, 169810–169821. https://doi.org/10.1109/ACCESS.2020.3023897
Bondar, O., Petrenko, G., Khalilov, A., Vahonova, O., Akimova, L., & Akimov, O. (2022). Construction Project Management Based on the Circular Economy. International Journal of Computer Science And Network Security, 22(9), 630–635. https://doi.org/10.22937/IJCSNS.2022.22.9.82
Buffinton, K. W., Martin, K. A., & Jablokow, K. W. (2002). Project team dynamics and cognitive style. EMJ - Engineering Management Journal, 14(3), 25–33. https://doi.org/10.1080/10429247.2002.11415170
Burstrom, T., & Wilson, T. L. (2018). The texture of tension: complexity, uncertainty and equivocality. International Journal of Managing Projects in Business, 11(2), 458–485. https://doi.org/10.1108/IJMPB-01-2017-0005
Cambridge Cognition. (2015). What Is Cognition & Cognitive Behaviour. Cambridge Cognition. https://www.cambridgecognition.com/blog/entry/what-is-cognition
Caughron, J. J., & Mumford, M. D. (2008). Project planning: The effects of using formal planning techniques on creative problem-solving. Creativity and Innovation Management, 17(3), 204–215. https://doi.org/10.1111/j.1467-8691.2008.00484.x
Chak, C. M., Carminati, L., & Wilderom, C. P. M. (2022). Hope, goal-commitment and -stress mediating between collaborative leadership, financial resources and performance. International Journal of Productivity and Performance Management. https://doi.org/10.1108/IJPPM-05-2021-0280
Chan, K.-Y., Oerlemans, L., & Meslec, N. (2021). The impact of multiple project team membership on individual and team learning: A micro-meso multi-level empirical study. International Journal of Project Management, 39(3), 308–320. https://doi.org/10.1016/j.ijproman.2020.11.002
Chang, A., Wiewiora, A., & Liu, Y. (2021). A socio-cognitive approach to leading a learning project team: A proposed model and scale development. International Journal of Project Management, 39(6), 646–657. https://doi.org/10.1016/j.ijproman.2021.05.003
Chang, J. Y. T. (2017). Mutual Monitoring of Resources in an Enterprise Systems Program. Project Management Journal, 48(1), 100–115. https://doi.org/10.1177/875697281704800107
Chang, K.-C., Yen, H.-W., Chiang, C.-C., & Parolia, N. (2013). Knowledge contribution in information system development teams: An empirical research from a social cognitive perspective. International Journal of Project Management, 31(2), 252–263. https://doi.org/10.1016/j.ijproman.2012.06.005
Chen, Y. M., & Wei, C.-W. (2009). Multiagent approach to solve project team work allocation problems. International Journal of Production Research, 47(13), 3453–3470. https://doi.org/10.1080/00207540802356754
Cheung, C. C., & Chuah, K. B. (2000). Intergroup conflict management framework for hong kong’s manufacturing industry. EMJ - Engineering Management Journal, 12(3), 26–33. https://doi.org/10.1080/10429247.2000.11415079
Cheung, S. O., Wong, W. K., Yiu, T. W., & Pang, H. Y. (2011). Developing a trust inventory for construction contracting. International Journal of Project Management, 29(2), 184–196. https://doi.org/10.1016/j.ijproman.2010.02.007
Choi, B., & Lee, S. (2018). An Empirically Based Agent-Based Model of the Sociocognitive Process of Construction Workers’ Safety Behavior. Journal of Construction Engineering and Management, 144(2). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001421
Chua, C. E. H., Lim, W. K., Soh, C., & Sia, S. K. (2012). Enacting clan control in complex it projects: a social capital perspective. Mis Quarterly, 36(2), 577–600. https://doi.org/10.2307/41703468
Collinge, W. H., & Harty, C. F. (2014). Stakeholder interpretations of design: semiotic insights into the briefing process. Construction Management and Economics, 32(7–8), 760–772. https://doi.org/10.1080/01446193.2014.894247
Cuganesan, S., & Floris, M. (2020). Investigating perspective taking when infrastructure megaproject teams engage local communities: Navigating tensions and balancing perspectives. International Journal of Project Management, 38(3), 153–164. https://doi.org/10.1016/j.ijproman.2020.01.006
Cuneo, F., Antonietti, J. P., & Mohr, C. (2018). Unkept promises of cognitive styles: A new look at old measurements. PLoS ONE, 13(8). https://doi.org/10.1371/journal.pone.0203115
Daniel, C., Daniel, P. A., & Smyth, H. (2022). The role of mindfulness in the management of projects: Potential opportunities in research and practice. International Journal of Project Management, 40(7), 849–864. https://doi.org/10.1016/j.ijproman.2022.07.003
Daniel, P. A., & Daniel, C. (2018). Complexity, uncertainty and mental models: From a paradigm of regulation to a paradigm of emergence in project management. International Journal of Project Management, 36(1), 184–197. https://doi.org/10.1016/j.ijproman.2017.07.004
Daradoumis, T., Xhafa, F., & Marquès, J. M. (2002). A methodological framework for project-based collaborative learning in a networked environment. International Journal of Continuing Engineering Education and Life-Long Learning, 12(5–6), 389–402. https://www.scopus.com/inward/record.uri?eid=2-s2.0-0036941907&partnerID=40&md5=cb259f40a6537bb36944e685372953e7
Dayan, M., & Di Benedetto, C. A. (2011). Team intuition as a continuum construct and new product creativity: The role of environmental turbulence, team experience, and stress. Research Policy, 40(2), 276–286. https://doi.org/10.1016/j.respol.2010.10.002
Defranco-tommarello, J., & Deek, F. P. (2004). Collaborative problem solving and groupware for software development. Information Systems Management, 21(1), 67–80. https://doi.org/10.1201/1078/43877.21.1.20041201/78987.7
Detzen, N., Verbeeten, F. H. M., Gamm, N., & Moller, K. (2018). Formal controls and team adaptability in new product development projects. Management Decision, 56(7), 1541–1558. https://doi.org/10.1108/MD-07-2017-0692
Di Filippo, D., Di Filippo, I., & Winston, R. (2019). From Mindfulness to Action: Applying Augmented Cognition to Project Management. Cognitive Readiness in Project Teams, 1–42. https://doi.org/10.4324/9780429490057-6
Drury-Grogan, M. L. (2021). The Changes in Team Cognition and Cognitive Artifact Use During Agile Software Development Project Management. Project Management Journal, 52(2), 127–145. https://doi.org/10.1177/8756972820960301
Du, J., Havard, B., Adams, J., & Li, H. (2005). A Project-Based Learning Approach: Online Group Collaborative Learning. International Journal of Information and Communication Technology Education (IJICTE), 1(4), 13–24. https://doi.org/10.4018/jicte.2005100102
Dwivedula, R., & Bredillet, C. N. (2010). Profiling work motivation of project workers. International Journal of Project Management, 28(2), 158–165. https://doi.org/10.1016/j.ijproman.2009.09.001
Edkins, A. J., Kurul, E., Maytorena-Sanchez, E., & Rintala, K. (2007). The application of cognitive mapping methodologies in project management research. International Journal of Project Management, 25(8), 762–772. https://doi.org/10.1016/j.ijproman.2007.04.003
Elbanna, S. (2015). Intuition in project management and missing links: Analyzing the predicating effects of environment and the mediating role of reflexivity. International Journal of Project Management, 33(6), 1236–1248. https://doi.org/10.1016/j.ijproman.2015.02.004
Elsbach, K. D., Barr, P. S., & Hargadon, A. B. (2005). Identifying situated cognition in organizations. Organization Science, 16(4), 422–433. https://doi.org/10.1287/orsc.1050.0138
Espinosa, J. A., DeLone, W., & Lee, G. (2006). Global boundaries, task processes and IS project success: A field study. Information Technology and People, 19(4), 345–370. https://doi.org/10.1108/09593840610718036
Farooq, M. U., Thaheem, M. J., & Arshad, H. (2018). Improving the risk quantification under behavioural tendencies: A tale of construction projects. International Journal of Project Management, 36(3), 414–428. https://doi.org/10.1016/j.ijproman.2017.12.004
Fellows, R., & Liu, A. (2016). Sensemaking in the cross-cultural contexts of projects. International Journal of Project Management, 34(2), 246–257. https://doi.org/10.1016/j.ijproman.2015.03.010
Fernandes, R. G., & Cohen, E. D. (2020). Conexões entre o julgamento moral e determinantes biológicos do comportamento na governança corporativa. Revista de Gestão e Projetos, 11(3), 155–184. https://doi.org/10.5585/gep.v11i3.18463
Florén, H. (2005). Managerial work and learning in small firms (PhD Dissertation, Chalmers University of Technology). Retrieved from https://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-555
Floris, M., & Cuganesan, S. (2019). Project leaders in transition: Manifestations of cognitive and emotional capacity. International Journal of Project Management, 37(3), 517–532. https://doi.org/10.1016/j.ijproman.2019.02.003
Flyvbjerg, B. (2021). Top Ten Behavioral Biases in Project Management: An Overview. Project Management Journal, 52(6), 531–546. https://doi.org/10.1177/87569728211049046
Forgues, D., & Koskela, L. (2009). The influence of a collaborative procurement approach using integrated design in construction on project team performance. International Journal of Managing Projects in Business, 2(3), 370–385. https://doi.org/10.1108/17538370910971036
Freeman, R. E. (1984). Strategic Management: A Stakeholder Approach. Pitman.
Freeman, R. E., Phillips, R., & Sisodia, R. (2020). Tensions in Stakeholder Theory. Business and Society, 59(2), 213–231. https://doi.org/10.1177/0007650318773750
Friedman, L., Fleishman, E. A., & Fletcher, J. M. (1992). Cognitive and interpersonal abilities related to the primary activities of R&D managers. Journal of Engineering and Technology Management, 9(3–4), 211–242. https://doi.org/10.1016/0923-4748(92)90017-Y
Gallagher, E. C., Mazur, A. K., & Ashkanasy, N. M. (2015). Rallying the troops or beating the horses? How project-related demands can lead to either high-performance or abusive supervision. Project Management Journal, 46(3), 10–24. https://doi.org/10.1002/pmj.21500
Galvão, M. C. B., & Ricarte, I. L. M. (2019). Revisão Sistemática Da Literatura: Conceituação, Produção E Publicação. Logeion: Filosofia Da Informação, 6(1), 57–73. https://doi.org/10.21728/logeion.2019v6n1.p57-73
Gavrilova, T., Leshcheva, I., & Strakhovich, E. (2015). Gestalt principles of creating learning business ontologies for knowledge codification. Knowledge Management Research and Practice, 13(4), 418–428. https://doi.org/10.1057/kmrp.2013.60
Ghaleenoei, N. K., Saghatforoush, E., Mansouri, T., & Zareravasan, A. (2021). An FCM-based Dynamic Modeling of Operability and Maintainability Barriers in Road Projects. International Journal of Pavement Research and Technology. https://doi.org/10.1007/s42947-021-00027-z
Giannoccaro, I., & Nair, A. (2016). Examining the Roles of Product Complexity and Manager Behavior on Product Design Decisions: An Agent-Based Study Using NK Simulation. IEEE Transactions on Engineering Management, 63(2), 237–247. https://doi.org/10.1109/TEM.2015.2510031
Globerson, S. (1997). Discrepancies between customer expectations and product configuration. International Journal of Project Management, 15(4), 199–203. https://doi.org/10.1016/S0263-7863(96)00065-8
Grand, J. A., Braun, M. T., Kuljanin, G., Kozlowski, S. W. J., & Chao, G. T. (2016). The dynamics of team cognition: A process-oriented theory of knowledge emergence in teams. Journal of Applied Psychology, 101(10), 1353–1385. https://doi.org/10.1037/apl0000136
Green, G. C. (2004). The impact of cognitive complexity on project leadership performance. Information and Software Technology, 46(3), 165–172. https://doi.org/10.1016/S0950-5849(03)00125-3
Guo, W., Lu, W., Gao, X., & Cai, F. (2021). How interpersonal ties affect interorganizational trust in construction projects: role differences and cross-level effects. Construction Management and Economics, 39(11), 912–931. https://doi.org/10.1080/01446193.2021.1994148
Habouba-Belinky, I., & Parush, A. (2020). Simulator-triggered debriefing facilitates team cognition and performance in simulator-based training. Journal of Interactive Learning Research, 31(1), 29–48. Waynesville, NC: Association for the Advancement of Computing in Education (AACE). Retrieved from https://www.learntechlib.org/primary/p/210322/
Han, J., & Hovav, A. (2016). Dimensionality of social capital and organizational citizenship behavior in information systems project teams. Journal of Computer Information Systems, 56(3), 218–227. https://doi.org/10.1080/08874417.2016.1153910
Han, Y., Yin, Z., Zhang, J., Jin, R., & Yang, T. (2020). Eye-Tracking Experimental Study Investigating the Influence Factors of Construction Safety Hazard Recognition. Journal of Construction Engineering and Management, 146(8). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001884
Hanakawa, N., Matsumoto, K.-I., & Torji, K. (2002). A knowledge-based software process simulation model. Annals of Software Engineering, 14(1–4), 383–406. https://doi.org/10.1023/A:1020574228799
Hanna, A. S., Ibrahim, M. W., Lotfallah, W., Iskandar, K. A., & Russell, J. S. (2016). Modeling Project Manager Competency: An Integrated Mathematical Approach. Journal Of Construction Engineering and Management, 142(8). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001141
Hatami, S. (2013). Learning styles. ELT Journal, 67(4), 488–490. https://doi.org/10.1093/elt/ccs083
Haynes, N. S., & Love, P. E. D. (2004). Psychological adjustment and coping among construction project managers. Construction Management and Economics, 22(2), 129–140. https://doi.org/10.1080/0144619042000201330
He, J. (2012). Counteracting Free-Riding With Team MoraleuAn Experimental Study. Project Management Journal, 43(3), 62–75. https://doi.org/10.1002/pmj.21272
Hekkala, R., Stein, M. K., & Rossi, M. (2018). Metaphors in managerial and employee sensemaking in an information systems project. Information Systems Journal, 28(1), 142–174. https://doi.org/10.1111/isj.12133
Heldal, F., Sjovold, E., & Stalsett, K. (2020). Shared cognition in intercultural teams: collaborating without understanding each other. Team Performance Management, 26(3/4), 211–226. https://doi.org/10.1108/TPM-06-2019-0051
Hilary, G., & Menzly, L. (2006). Does past success lead analysts to become overconfident? Management Science, 52(4), 489–500. https://doi.org/10.1287/mnsc.1050.0485
Hollan, J., Hutchins, E., & Kirsh, D. (2000). Distributed Cognition: Toward a New Foundation for Human-Computer Interaction Research. ACM Transactions on Computer-Human Interaction, 7(2), 174–196. https://doi.org/10.1145/353485.353487
Hsu, H.-C., Chang, S., Chen, C.-C., & Wu, I.-C. (2020). Knowledge-based system for resolving design clashes in building information models. Automation in Construction, 110. https://doi.org/10.1016/j.autcon.2019.103001
Hutchins, E. (1995). Cognition in the Wild. Cognition in the Wild. https://doi.org/10.7551/mitpress/1881.003.0001
Hutchins, E. (2000). Distributed Cognition. IESBS Distributed Cognition, 1–10. https://arl.human.cornell.edu/linked docs/Hutchins_Distributed_Cognition.pdf
Hyldegård, J. (2006). Collaborative information behaviour-exploring Kuhlthau’s Information Search Process model in a group-based educational setting. Information Processing and Management, 42(1 SPEC. ISS), 276–298. https://doi.org/10.1016/j.ipm.2004.06.013
Jääskä, E., & Aaltonen, K. (2022). Teachers’ experiences of using game-based learning methods in project management higher education. Project Leadership and Society, 3. https://doi.org/10.1016/j.plas.2022.100041
Jenkin, T. A., Chan, Y. E., & Sabherwal, R. (2019). Mutual understanding in information systems development: Changes within and across projects. MIS Quarterly: Management Information Systems, 43(2), 649–671. https://doi.org/10.25300/MISQ/2019/13980
Julsrud, T. E. (2008). Flows, bridges and brokers: Exploring the development of trust relations in a distributed work group. International Journal of Networking and Virtual Organisations, 5(1), 83–102. https://doi.org/10.1504/IJNVO.2008.016004
Kahvandi, Z., Saghatforoush, E., Ravasan, A. Z., & Mansouri, T. (2018). An FCM-based dynamic modelling of integrated project delivery implementation challenges in construction projects. Lean Construction Journal, 2018, 63–87
Kamhawi, E. M. (2008). Determinants of Bahraini managers’ acceptance of business process reengineering. Business Process Management Journal, 14(2), 166–187. https://doi.org/10.1108/14637150810864916
Keane, S. F. (2022). Becoming a project manager: A social cognitive perspective. Project Leadership and Society, 3. https://doi.org/10.1016/j.plas.2022.100051
Khedhaouria, A., Montani, F., & Thurik, R. (2017). Time pressure and team member creativity within R&D projects: The role of learning orientation and knowledge sourcing. International Journal of Project Management, 35(6), 942–954. https://doi.org/10.1016/j.ijproman.2017.04.002
Kwak, Y. H., Park, J., Chung, B. Y., & Ghosh, S. (2012). Understanding End-Users’ Acceptance of Enterprise Resource Planning (ERP) System in Project-Based Sectors. IEEE Transactions on Engineering Management, 59(2), 266–277. https://doi.org/10.1109/TEM.2011.2111456
Leung, M.-Y., & Liu, A. M. M. (2003). Analysis of value and project goal specificity in value management. Construction Management and Economics, 21(1), 11–19. https://doi.org/10.1080/0144619032000065081
Leung, M.-Y., Ng, S. T., & Cheung, S.-O. (2002). Improving satisfaction through conflict stimulation and resolution in value management in construction projects. Journal of Management in Engineering, 18(2), 68–75. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(68)
Levitt, R. E., Thomsen, J., Christiansen, T. R., Kunz, J. C., Jin, Y., & Nass, C. (1999). Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design. Management Science, 45(11), 1479–1495. https://doi.org/10.1287/mnsc.45.11.1479
Li, K. Y., Wang, D., Sheng, Z. T., & Griffin, M. A. (2022). A Deep Dive into Worker Psychological Well-Being in the Construction Industry: A Systematic Review and Conceptual Framework. Journal of Management in Engineering, 38(5). https://doi.org/10.1061/(ASCE)ME.1943-5479.0001074
Ligorio, M. B., Talamo, A., & Pontecorvo, C. (2005). Building intersubjectivity at a distance during the collaborative writing of fairytales. Computers and Education, 45(3), 357–374. https://doi.org/10.1016/j.compedu.2005.04.013
Lin, T.-C., Hsu, J. S.-C., Cheng, K.-T., & Wu, S. (2012). Understanding the role of behavioural integration in ISD teams: An extension of transactive memory systems concept. Information Systems Journal, 22(3), 211–234. https://doi.org/10.1111/j.1365-2575.2011.00383.x
Ling, Y. Y. (2002). Model for predicting performance of architects and engineers. Journal of Construction Engineering and Management, 128(5), 446–455. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:5(446)
Liu, G. H. W., Wang, E. T. G., & Chua, C. E. H. (2015). Persuasion and management support for IT projects. International Journal of Project Management, 33(6), 1249–1261. https://doi.org/10.1016/j.ijproman.2015.03.009
Liu, K., Su, Y., Pollack, J., Liang, H., & Zhang, S. (2022). Explaining the Formation Mechanism of Intrateam Knowledge Exchange Network in Offsite Construction Projects: A Social Cognitive Perspective. Journal of Construction Engineering and Management, 148(2). https://doi.org/10.1061/(asce)co.1943-7862.0002190
Liu, L., & Yetton, P. (2007). The contingent effects on project performance of conducting project reviews and deploying project management offices. IEEE Transactions on Engineering Management, 54(4), 789–799. https://doi.org/10.1109/TEM.2007.906852
Liu, Y., Amini-Abyaneh, A., Hertogh, M., Houwing, E. J., & Bakker, H. (2021). Collaborate to learn and learn to collaborate: a case of exploitative learning in the inter-organizational project. Engineering, Construction and Architectural Management, 28(3), 809–830. https://doi.org/10.1108/ECAM-01-2020-0078
Loch, C. H. (2017). Creativity and Risk Taking Aren’t Rational: Behavioral Operations in MOT. Production And Operations Management, 26(4), 591–604. https://doi.org/10.1111/poms.12666
Loosemore, M., & Chandra, V. (2012). Learning through briefing: For strategic facilities management in the health sector. Built Environment Project and Asset Management, 2(1), 103–117. https://doi.org/10.1108/20441241211235080
Loosemore, M., Higgon, D., & Osborne, J. (2020). Managing new social procurement imperatives in the Australian construction industry. Engineering Construction and Architectural Management, 27(10), 3075–3093. https://doi.org/10.1108/ECAM-11-2019-0643
Lu, S., & Hao, G. (2013). The influence of owner power in fostering contractor cooperation: Evidence from China. International Journal of Project Management, 31(4), 522–531. https://doi.org/10.1016/j.ijproman.2012.10.008
Lu, S. K., & Yan, H. (2016). Contractual control, the propensity to trust, active trust development: construction industry. Journal of Business and Industrial Marketing, 31(4), 459–471. https://doi.org/10.1108/JBIM-10-2014-0200
Majchrzak, A., Beath, C. M., Lim, R. A., & Chin, W. W. (2005). Managing client dialogues during information systems design to facilitate client learning. MIS Quarterly: Management Information Systems, 29(4), 653–672. https://doi.org/10.2307/25148704
Manu, E., Ankrah, N., Chinyio, E., & Proverbs, D. (2013). A cognitive approach to trust management in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), 232–239. https://doi.org/10.1680/mpal.12.00006
Marshall, N. (2008). Cognitive and practice-based theories of organizational knowledge and learning: Incompatible or complementary? Management Learning, 39(4), 413–435. https://doi.org/10.1177/1350507608093712
Maytorena, E., Winch, G. M., Freeman, J., & Kiely, T. (2007). The influence of experience and information search styles on project risk identification performance. IEEE Transactions on Engineering Management, 54(2), 315–326. https://doi.org/10.1109/TEM.2007.893993
Moore, D. R. (2002). Perception “noise” in the cognition of visualised construction process concepts. Electronic Journal of Information Technology in Construction, 7, 157–166. https://www.scopus.com/inward/record.uri?eid=2-s2.0-3042601682&partnerID=40&md5=e3ed840a07ce6af92f88172d24fa05cb
Mubarak, N., Khan, J., Safdar, S., Muhammad, S., & Riaz, A. (2021). Ethical leadership in project-based organizations of Pakistan: the role of psychological empowerment and Islamic work ethics. Management Research Review. https://doi.org/10.1108/MRR-08-2020-0536
Nembhard, D., Yip, K., & Shtub, A. (2009). Comparing Competitive and Cooperative Strategies for Learning Project Management. Journal Of Engineering Education, 98(2), 181–192. https://doi.org/10.1002/j.2168-9830.2009.tb01016.x
Niler, A. A., Mesmer-Magnus, J. R., Larson, L. E., Plummer, G., DeChurch, L. A., & Contractor, N. S. (2021). Conditioning team cognition: A meta-analysis. Organizational Psychology Review, 11(2), 144–174. https://doi.org/10.1177/2041386620972112
Patanakul, P. (2022). How to Achieve Effectiveness in Project Portfolio Management. IEEE Transactions on Engineering Management, 69(4), 987–999. https://doi.org/10.1109/TEM.2020.2964316
Pavez, I., Gómez, H., Laulié, L., & González, V. A. (2021). Project team resilience: The effect of group potency and interpersonal trust. International Journal of Project Management, 39(6), 697–708. https://doi.org/10.1016/j.ijproman.2021.06.004
PIETRAS, C. M., & COURY, B. G. (1994). The development of cognitive models of planning for use in the design of project-management systems. International Journal of Human-Computer Studies, 40(1), 5–30. https://doi.org/10.1006/ijhc.1994.1002
PMI. (2017). A guide to the Project Management Body of Knowledge | PMBOK Guide - 6th Edition.
PMI. (2021). The Standard for Project Management and A Guide to the Project Management Body of Knowledge (7th ed.). Project Management Institute.
Poirier, E. A., Forgues, D., & Staub-French, S. (2017). Understanding the impact of BIM on collaboration: a Canadian case study. Building Research and Information, 45(6), 681–695. https://doi.org/10.1080/09613218.2017.1324724
Pollock, A., & Berge, E. (2018). How to do a systematic review. International Journal of Stroke, 13(2), 138–156. https://doi.org/10.1177/1747493017743796
Prince, M. W. (1992). Implications of perception and strategy for engineers in construction management. Construction Management and Economics, 10(2), 93–105. https://doi.org/10.1080/01446199200000010
Qian, Q., Zhang, L., & Cao, T. (2020). Effect of Behavior Tension on Value Creation in Owner–Contractor Relationships: Moderating Role of Dependence Asymmetry. EMJ - Engineering Management Journal. https://doi.org/10.1080/10429247.2020.1796173
Rashid, A., & Boussabiane, H. (2021). Conceptualizing the influence of personality and cognitive traits on project managers’ risk-taking behaviour. International Journal of Managing Projects in Business, 14(2), 472–496. https://doi.org/10.1108/IJMPB-11-2017-0138
Rave, J. I. P., Guerrero, R. F., Vallina, A. S., Echavarría, F. G. (2022). Critical thinking, dynamic capabilities, and project performance: empirical evidence in the continuous improvement project domain. Total Quality Management & Business Excellence, 34:5-6, 768–790 https://doi.org/10.1080/14783363.2022.2111994
Robinson, M. A., Sparrow, P. R., Clegg, C., & Birdi, K. (2005). Design engineering competencies: future requirements and predicted. changes in forthcoming decade. Design Studies, 26(2), 123–153. https://doi.org/10.1016/j.destud.2004.09.004
Rogers, Y. (1997). A brief introduction to distributed cognition. Retrieved from http://www.cogs.susx.ac.uk/users/yvonner/dcog.html
Rouleau, N., Murugan, N. J., & Kaplan, D. L. (2021). Toward Studying Cognition in a Dish. Trends in Cognitive Sciences, 25(4), 294–304. https://doi.org/10.1016/j.tics.2021.01.005
Sangwan, R. S., Jablokow, K. W., & Defranco, J. F. (2020). Asynchronous Collaboration: Bridging the Cognitive Distance in Global Software Development Projects. IEEE Transactions on Professional Communication, 63(4), 361–371. https://doi.org/10.1109/TPC.2020.3029674
Schlindwein, E., & Geppert, M. (2020). Towards a process model of emotional sensemaking in post-merger integration: linking cognitive and affective dimensions. Critical Perspectives on International Business. https://doi.org/10.1108/cpoib-02-2020-0008
Schultz, C., Gretsch, O., & Kock, A. (2021). The influence of shared R&D-project innovativeness perceptions on university-industry collaboration performance. Journal of Technology Transfer, 46(4), 1144–1172. https://doi.org/10.1007/s10961-020-09818-1
Seel, N. M. (2012). Encyclopedia of the Sciences of Learning. In N. M. Seel (Ed.), Choice Reviews Online (Vol. 50, Issue 03). Springer New York Dordrecht Heidelberg London. https://doi.org/10.5860/choice.50-1234
Sense, A. J. (2007). Learning within project practice: Cognitive styles exposed. International Journal of Project Management, 25(1), 33–40. https://doi.org/10.1016/j.ijproman.2006.06.004
Sergeeva, N., & Duryan, M. (2021). Reflecting on knowledge management as an enabler of innovation in project-based construction firms. Construction Innovation-England. https://doi.org/10.1108/CI-09-2020-0148
Seus, F., Weissenberger-Eibl, M. A., & Zern-Breuer, R. (2020). Considering representational gaps - How subsidiaries’ relationship affects multi-location project management. International Journal of Project Organisation and Management, 12(4), 321–345. https://doi.org/10.1504/IJPOM.2020.111068
Shand, R. M. (1994). User Manuals as Project Management Tools: Part II—Practical Applications. IEEE Transactions on Professional Communication, 37(3), 123–142. https://doi.org/10.1109/47.317478
Shealy, T., & Hu, M. (2018). Opportunities to advance engineering cognition and project level decision making by adopting emergent methods from neuroscience. Construction Research Congress 2018: Construction Information Technology - Selected Papers from the Construction Research Congress 2018, 2018-April, 127–136. https://doi.org/10.1061/9780784481264.013
Shipley, M. F., & Johnson, M. (2009). A fuzzy approach for selecting project membership to achieve cognitive style goals. European Journal of Operational Research, 192(3), 918–928. https://doi.org/10.1016/j.ejor.2007.10.006
Simon, L. (2006). Managing creative projects: An empirical synthesis of activities. International Journal of Project Management, 24(2), 116–126. https://doi.org/10.1016/j.ijproman.2005.09.002
Small, J., & Walker, D. (2011). Providing structural openness to connect with context: Seeing the project entity as a human activity system and social process. International Journal of Managing Projects in Business, 4(3), 389–411. https://doi.org/10.1108/17538371111144148
Smith, P. L. (1992). Professionalism: Cornerstone of engineering. Journal of Professional Issues in Engineering Education and Practice, 118(3), 258–260. https://doi.org/10.1061/(ASCE)1052-3928(1992)118:3(258)
Smulders, F., Lousberg, L., & Dorst, K. (2008). Towards different communication in collaborative design. International Journal of Managing Projects in Business, 1(3), 352–367. https://doi.org/10.1108/17538370810883819
Smyth, H., Gustafsson, M., & Ganskau, E. (2010). The value of trust in project business. International Journal of Project Management, 28(2), 117–129. https://doi.org/10.1016/j.ijproman.2009.11.007
Song, H., Hou, J., Yang, X., & Zhang, Y. (2022). The Impact of Risk Perception Difference of Members of a Scientific Research Project Team on Information Adoption: The Moderating Effect of Knowledge Inertia. Sustainability (Switzerland), 14(13). https://doi.org/10.3390/su14137749
Sperry, R. C., & Jetter, A. J. (2019). A Systems Approach to Project Stakeholder Management: Fuzzy Cognitive Map Modeling. Project Management Journal, 50(6), 699–715. https://doi.org/10.1177/8756972819847870
Strang, K. D., & Vajjhala, N. R. (2022). Testing Risk Management Decision Making Competency of Project Managers In A Crisis. Journal of Modern Project Management, 10(1), 53–71. https://doi.org/10.19255/JMPM02904
Thomas, J. L., & Buckle-Henning, P. (2007). Dancing in the white spaces: Exploring gendered assumptions in successful project managers’ discourse about their work. International Journal of Project Management, 25(6), 552–559. https://doi.org/10.1016/j.ijproman.2007.05.001
Tullett, A. D. (1996). The thinking style of the managers of multiple projects: Implications for problem solving when managing change. International Journal of Project Management, 14(5), 281–287. https://doi.org/10.1016/0263-7863(96)84511-X
Tuuli, M. M., & Rowlinson, S. (2009). Empowerment in project teams: A multilevel examination of the job performance implications. Construction Management and Economics, 27(5), 473–498. https://doi.org/10.1080/01446190902729713
Ugwu, O. O., Anumba, C. J., & Thorpe, A. (2004). The development of cognitive models for constructability assessment in steel frame structures. Advances In Engineering Software, 35(3–4), 191–203. https://doi.org/10.1016/j.advengsoft.2004.02.001
Um, K.-H., & Oh, J.-Y. (2021). The mediating effects of cognitive conflict and affective conflict on the relationship between new product development task uncertainty and performance. International Journal of Project Management, 39(1), 85–95. https://doi.org/10.1016/j.ijproman.2020.11.003
Upadhayay, N., & Guragin, S. (2014). Comparison of cognitive functions between male and female medical students: A pilot study. Journal of Clinical and Diagnostic Research, 8(6). https://doi.org/10.7860/JCDR/2014/7490.4449
Vaux, J. S., & Kirk, W. M. (2018). Relationship Conflict in Construction Management: Performance and Productivity Problem. Journal oOf Construction Engineering and Management, 144(6). https://doi.org/10.1061/(ASCE)CO.1943-
0001478
Vlaar, P. W. L., Van Fenema, P. C., & Tiwari, V. (2008). Cocreating understanding and value in distributed work: How members of onsite and offshore vendor teams give, make, demand, and break sense. MIS Quarterly: Management Information Systems, 32(2), 227–255. https://doi.org/10.2307/25148839
Wang, G., Locatelli, G., Wan, J., Li, Y., & Le, Y. (2021). Governing behavioral integration of top management team in megaprojects: A social capital perspective. International Journal of Project Management, 39(4), 365–376. https://doi.org/10.1016/j.ijproman.2020.11.005
Wang, W. S., Fu, Y. T., Gao, J., Shang, K., Gao, S. L., Xing, J. W., Ni, G. D., Yuan, Z. M., Qiao, Y. N., & Mi, L. Y. (2021). How the COVID-19 Outbreak Affected Organizational Citizenship Behavior in Emergency Construction Megaprojects: Case Study from Two Emergency Hospital Projects in Wuhan, China. Journal of Management in Engineering, 37(3). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000922
Wei, M., Hao, S., & Ren, X. (2022). Nonspatial Proximity and Project Team Resilience: The Role of Knowledge Sharing and Team Cohesion. Discrete Dynamics in Nature and Society, 2022. https://doi.org/10.1155/2022/8614056
Weiss, M., Hoegl, M., & Gibbert, M. (2011). Making virtue of necessity: The role of team climate for innovation in resource-constrained innovation projects. Journal of Product Innovation Management, 28(SUPPL. 1), 196–207. https://doi.org/10.1111/j.1540-5885.2011.00870.x
Weissenberg, P., & Gruenfeld, L. W. (1966). Relationships among leadership dimensions and cognitive style. Journal of Applied Psychology, 50(5), 392–395. https://doi.org/10.1037/h0023854
Whelton, M., Ballard, G., & Tommelein, I. D. (2002). A knowledge management framework for project definition, ITcon Vol. 7, Special issue ICT for Knowledge Management in Construction, 197-212, https://www.itcon.org/2002/13
Wiewiora, A., Chang, A., & Smidt, M. (2020). Individual, project and organizational learning flows within a global project-based organization: exploring what, how and who. International Journal of Project Management, 38(4), 201–214. https://doi.org/10.1016/j.ijproman.2020.03.005
Williams, R. A. (2019). Conflict Propagation Within Large Technology and Software Engineering Programmes: A Multi-Partner Enterprise System Implementation as Case Study. IEEE Access, 7, 167696–167713. https://doi.org/10.1109/ACCESS.2019.2953952
Williams, T., Eden, C., Ackermann, F., & Tait, A. (1995). Vicious circles of parallelism. International Journal of Project Management, 13(3), 151–155. https://doi.org/10.1016/0263-7863(95)00034-N
Wilson, J. R., Farrington-Darby, T., Cox, G., Bye, R., & Hockey, G. R. J. (2007). The railway as a socio-technical system: Human factors at the heart of successful rail engineering. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 221(1), 101–115. https://doi.org/10.1243/09544097JRRT78
Wong, W. K., Cheung, S. O., Yiu, T. W., & Pang, H. Y. (2008). A framework for trust in construction contracting. International Journal of Project Management, 26(8), 821–829. https://doi.org/10.1016/j.ijproman.2007.11.004
Xiang, C., Yang, Z., & Zhang, L. (2016). Improving IS development teams’ performance during requirement analysis in project—The perspectives from shared mental model and emotional intelligence. International Journal of Project Management, 34(7), 1266–1279. https://doi.org/10.1016/j.ijproman.2016.06.009
Yang, X., Wang, L., Zhu, F., & Müller, R. (2022). Prior and governed stakeholder relationships: The key to resilience of inter-organizational projects. International Journal of Project Management, 40(1), 64–75. https://doi.org/10.1016/j.ijproman.2021.10.001
Yang, Y. X., Huang, J. Y., Wu, P. P., Zheng, X. J., Lin, H., & Ji, S. L. (2022). Responsible leadership and project citizenship behavior: A cross-level investigation. Frontiers in Psychology, 13. https://doi.org/10.3389/fpsyg.2022.960290
Yap, J. B. H., Abdul-Rahman, H., & Chen, W. (2017). Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication. International Journal of Project Management, 35(7), 1253–1271. https://doi.org/10.1016/j.ijproman.2017.04.010
Yue, C., Fong, P. S. W., & Li, T. (2019). Meeting the challenge of workplace change: Team cooperation outperforms team competition. Social Behavior and Personality, 47(7). https://doi.org/10.2224/sbp.7997
Zhang, L., Yuan, J., Ning, Y., Xia, N., & Zhang, G. (2021). Enhancing the impacts of absorptive capacity on interorganizational collaboration in BIM-enabled construction projects – an SLT perspective. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-11-2020-0931
Zheng, J. W., Wu, G. D., Xie, H. T., & Li, H. Y. (2019). Leadership, organizational culture, and innovative behavior in construction projects: The perspective of behavior-value congruence. International Journal of Managing Projects in Business, 12(4), 888–918. https://doi.org/10.1108/IJMPB-04-2018-0068
Descargas
Publicado
Cómo citar
Número
Sección
Licencia
Derechos de autor 2023 Journal of Management & Technology
Esta obra está bajo una licencia internacional Creative Commons Atribución-NoComercial 4.0.
Os direitos, inclusive os de tradução, são reservados. É permitido citar parte de artigos sem autorização prévia desde que seja identificada a fonte. A reprodução total de artigos é proibida. Em caso de dúvidas, consulte o Editor.