THE MEMBRANE METHOD OF ASSESSMENT OF ORGANIZATIONAL AND TECHNICAL RELIABILITY AND AGGREGATE RISK OF NPP CONSTRUCTION PROJECTS

Authors

  • Petr Grigorievich Grabovy Department of Construction Organization and Real Estate Management, Moscow State University of Civil Engineering, Russia. Royal Institution of Chartered Surveyors (RICS). Great Britain
  • Denis Evgenyevich Sezemin Department of Construction Organization and Real Estate Management at the Moscow State University of Civil Engineering, Russia. JSC Akkuyu Nuclear. Republic of Türkiye

DOI:

https://doi.org/10.20397/2177-6652/2024.v24i2.2764

Keywords:

nuclear power plant (NPP) construction, organizational and technical reliability management, mathematical modelling, computer risk modelling, risk management, industrial construction

Abstract

This study aims to enhance the organizational and technical reliability of design solutions in nuclear power plant (NPP) construction projects, particularly under risk conditions. It focuses on identifying effective strategies to manage and mitigate risks throughout the project life cycle, ensuring the successful and safe completion of technically complex NPP facilities. The conducted system analysis is the basis of methodical recommendations on the selection of a rational option for the organization of the construction of a nuclear power plant (NPP). The results of the research article are based on the analysis of practical activities of the participants of the construction project of a unique and technically complex NPP facility, aimed at improving the organizational and technical reliability of design solutions at all stages of the project life cycle under risk conditions. Conclusions and practical recommendations have been made on the basis of the author’s membrane-method simulation model of risk analysis, developed using a modern approach to the application of automated systems of production process planning for the implementation of the NPP project.

References

Alshreideh, M., Yengovatov, I., Morozenko, A. (2023, January 24). Issues of NPP life cycle management. Energy Policy. Retrieved from https://energypolicy.ru/voprosy-upravleniyazhiznennym-cziklom-aes/energetika/2023/19/24/?ysclid=lqm65v851c52085139

Brykalova, S.M., Trifonov, V.Yu. Gurieva, E.A. (2021). Development of risk classifier as a stage of successful risk management. Scientific and Practical Journal “Problems of Risk Analysis,” 18(6), 40-53. https://doi.org/10.32686/1812-5220-2021-18-6-40-53

Ermakova, A., Finogenova, Y., & Subbota, K. (2023). Assessment of industry specifics impact on the ESG rating among russian companies. Revista Gestão & Tecnologia, 23, 53-71. doi:https://doi.org/10.20397/2177-6652/2023.v23i1.2575

Gavrilov, K.A., Krasavina, L.N. (n.d.). Risk. The Great Russian Encyclopaedia, 2004–2017. Retrieved from https://old.bigenc.ru/economics/text/3510546#:~:text=РИСК%20(франц.%20risque%2C%20от%20итал.,в%20обыденном%20и%20политич.%20дискурсе

Grabovy, P.G. (Ed.). (2012). Risk management in real estate: Textbook. Moscow: Prospekt, 424 p.

Grabovy, P.G. (Ed.). (2017). Risks in modern business: A monograph. Moscow: IIA Prosvetitel, 228 p.

Grabovy, P.G. (Ed.). (2018). Organization of construction and real estate development. Part I: Organization of construction (4th ed. revised and suppl). Moscow: ASV Publishing House, IIA Prosvetitel, 648 p.

Grabovy, P.G., Lapidus, A.A. (Eds.). (2022). Construction management. Part I. Organizational models of management and contract constructions of the capital construction project: Textbook in two parts and practicum (Part 3) (4th ed., revised and suppl.). Moscow: ASV Publishing House, Prosvetitel, 484 p.

Gusakova, E.A., Pavlov, A.S. (2022). Fundamentals of organization and management in construction: Textbook and workshop for universities (2nd ed., revised and suppl.). Moscow: Yurait Publishing House, 648 p.

Khoruzhy, L., Katkov, Y., Romanova, A., Katkova, E., & Dzhikiya, M. (2022). Adaptive management reporting system in inter-organizational relations of agricultural enterprises according to ESG principles. Journal of Infrastructure, Policy and Development, 6(2), 1649. doi:http://dx.doi.org/10.24294/jipd.v6i2.1649

Kiseleva, I. ., Tramova, A., Kalmykova, T., & Koryakovsky, A. (2023). Análisis de modelos de evaluación del riesgo de crédito para garantizar la seguridad económica de una organización en el contexto de la digitalización. Nexo Revista Científica, 36(03), 319–330. https://doi.org/10.5377/nexo.v36i03.16453

Lyshchikova, J., Stryabkova, E., Vladyka, M., Kulik, A., & Bondareva, Y. (2023). Gestión estratégica de la especialización inteligente en el desarrollo económico regional: conexión de competencias exportadoras, sectoriales, científicas y tecnológicas. Nexo Revista Científica, 36(05), 180–192. https://doi.org/10.5377/nexo.v36i05.17307

Mazur, I.I., Shapiro, V.D. (2010). Project management: Textbook. Moscow: Omega-L, 960 p.

Neftegaz.ru. (2012, November 15). EPC kontrakt [EPC Contract]. Retrieved from https://neftegaz.ru/tech-library/menedzhment/141747-epc-podryad-kontrakt/#:~:text=EPC%20-%20контракт%20(Engineering%2C%20Procurement%2C,фиксированной%20цене%20к%20фиксированной%20дате

Ovsyannikova, T.Yu. (2004). Economics of the construction complex. Economic substantiation and realization of investment projects: Textbook. Tomsk: TGASU, 239 p.

Ramenskaya, A.V., Pivovarova, K.V. (2018). Methodological guidelines: The Monte Carlo method and instrumental means of its realization. Orenburg: FGBOU of Higher Education Orenburg State University.

Safiullin, M., Yelshin, L., & Mingulov, A. (2023). Risks for the sustainable economic development of the volga federal district in the context of sanctions imposed on import supplies. Revista Gestão & Tecnologia, 23(4), 342-359. doi:https://doi.org/10.20397/2177-6652/2023.v23i4.2690

Sezyomin, D.E. (2022). Integrated development of undeveloped territories. Experience of NPP Akkuyu construction by Rosatom State Corporation (Türkiye). Paper presented at the National scientific and practical conference, October 21–22, 2022, NI MGSU, Moscow, Russia.

Wikipedia, the free encyclopedia. (n.d.). EPC (kontrakt) [EPC (contract)]. Retrieved from https://ru.wikipedia.org/wiki/EPC_(контракт)